Cost Value Engineering (QSB 4214)
The module provides the history, background, theories,
concepts and principles of value engineering / value management in decision
making process. The module also
introduces the idea of unnecessary cost and cost cutting exercise in the cost
planning and control stage. It is then
generally covers area of implementation of value engineering and the key person
involve – the facilitator. The module
concluded with a series of discussion on the problem and constraint in the
implementation stage based on some significant case studies.
Objectives:
1.
To create an understanding in general the
value process, function analysis and team dynamics in the client’s value
system.
2.
To identify solutions to undertake value studies at
different stage of a project.
3. To recommend
a more collaborative effort towards the promotion and awareness of value
management in Malaysian construction industry in an effort to achieve value for
money invested.
Learning Outcome:
After taking this subject,
1) I am able to identify the appropriate
time to carry out Value Engineering throughout different construction phases.
2) I am able to recognize and recall the contribution of the value engineering /value management in the development process
3) I am able to apply the value management to a value outcome in the decision making process.
4) I am able to analyse the cost and value implications of project scope .and generate a Job-Plan for the implementation of Value Management workshop.
Assignment
Students in groups of 8 were required to prepare a case study of Value Management application in the Construction Industry .The main aim of this group assignment is to help students develop a deeper appreciation of the concepts learnt in this module by applying them in the assignment. Students were expected to explore outcome of the implication for case study in Malaysia Construction Industry both in public and private sectors.
Test
After few months of studying this subject, a mid term test on topics from chapter 1-6 was administered to test the students on waht they have learnt from past few months. This is to test the ability of the students in identifying, analysing and applying the principles of cost value engineering in the test.
No comments:
Post a Comment